条件筛选
-
A Detailed Explanation of the Porphyra (Nori) Cultivation Process, Key Technical Points and Precautions
Abstract Site selection: choose a sea area with smooth tidal flow, slight wind and waves, and below the high tide line. Cultivation equipment: professional net curtains need to be made, then planned and placed into the sea. Timely stocking: the stocking time is from the end of September to the beginning of October. Seedling cultivation: hang up the seedling nets and patrol every day,